NOTE
Perform steps 19 through 21 for 200-amp dual voltage
alternators only.
Perform steps 21.1 and 21.2 for 400-amp dual voltage
alternators only.
19.
Slide back rubber boot (3) and remove nut (2), lead 568 (1.1), and washer (1) from IGN terminal
(15) on voltage regulator (9).
20.
Slide back rubber boot (4) and remove nut (5), lead 2A (5.1), and washer (6) from AC terminal (8) on
voltage regulator (9).
21.
Slide back rubber boot (14) and remove nut (12), washer (11), and lead 68A (13) from terminal (10)
on voltage regulator (9).
21.1. Slide back rubber boot (22.9) and remove nut (22.7), washer (22.8), and lead 5A (22.10) from red
terminal (22.5) on voltage regulator (22.11).
21.2. Slide back rubber boot (22.4) and remove nut (22.2), washer (22.3), and lead 2A (22.6) from yellow
terminal (22.1) on voltage regulator (22.11).
22.1
22.6
22.4
22.3
22.7
22.8
22.9
22.2
18-6. ENGINE WIRING HARNESS REPLACEMENT (Cont'd)
TM 9-2320-387-24-2
18-38
Change 1
20
19
22
21
17
18
M1113
1
3
1.1
15
2
5
4
14
12
13
10
11
5.1
6
8
9
22.10
22.5
22.11
200-AMP DUAL VOLTAGE ALTERNATOR
400-AMP DUAL VOLTAGE ALTERNATOR