TM 9-2320-387-24-2
I 1 O-50. CARGO BULKHEAD EXTENSION MAINTENANCE
This task covers:
a. Removal
b. Disassembly
INITIAL SETUP:
c. Assembly
d. Installation
Applicable Models
Ml113
Materials/Parts
Eight locknuts (Appendix G, Item 127)
Tools
General mechanics tool kit:
automotive (Appendix B, Item 1)
Manual References
TM 9-2320-387-24P
Maintenance Level
Unit
Remove quick-release pin (12) from post assembly (4) and remove cargo barrier extension (5) from cargo
bulkhead (13).
71
1.
Remove screw (6) and lanyard (7) from post assembly (4).
2.
Remove twenty-four screws (11, nut and washer assemblies (31, and three backboards (2) from four
post assemblies (4).
3.
Remove eight locknuts (ll), washers (91, capscrews (81, washers (91, and four mounting brackets (10)
from cargo bulkhead (13). Discard locknuts (11).
rXz&l
1.
Install lanyard (7) on post assembly (4) with screw (6).
2.
Install three backboards (2) on post four assemblies (4) with twenty-four screws (1) and nut and
washer assemblies (3).
3.
Install four mounting brackets (10) on cargo bulkhead (13) with eight washers (91, capscrews (8i,
washers (91, and locknuts (11).
d. Installation
NOTE
When installing cargo barrier extension, ensure side rack pins on
post assemblies slide into holes of cargo bulkhead.
Install cargo barrier extension (5) on cargo bulkhead (13) with quick-release pin (12).
1 O-84