TM 9-2320-387-24-l
4-69. POWER FEED-THROUGH STUD REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Tools
?&era1
mechanics tool kit:
automotive (Appendix B, Item 1)
Maintena.nce and repair shop equipment:
automotive (Appendix B, Item 2)
MaterialsParts
Lockwasher (Appendix G, Item 212)
Sealing compound (Appendix C, Item 64)
Manual References
TM 9-2320-387-24P
Equipment Condition
Buss bar removed (para. 4-711.
Maintenance
Level
Unit
1.
Slide rubber boot (5) from power feed-through stud (9) and remove nut (11, lockwasher (2), washer (31,
lead 6B/6C (41, and starter cable (6) from feed-through stud (9). Discard lo&washer (2).
2.
Remove nut (7) and feed-through stud (9) from battery box (8).
b. Installation
1.
Install power feed-through stud (9) on battery box (8) with nut (7).
2.
Install starter cable (6) and lead 6B/6C (4) on feed-through stud (9) with washer (3), lockwasher (2),
and nut (1). Tighten nut (1) to 18-22 lb-R (24-30 N-m).
3.
Apply sealing compound to feed-through stud (9), starter cable (61, and lead 6B/6C (41, coating all
exposed metallic surfaces.
4.
Slide rubber boot (5) over feed-through stud (9).
4-116
