TM 9-2320-362-14&P
4-18. EES KIT INSTALLATION (Contd)
7. Determine center of hole (1) on right side of transmission tunnel (3) as
follows:
(a) Measure 3 7/8-inch (9.84 cm) from rear of battery box (4), and
(b) Measure 1 5/8-inch (4.13 cm) from wall on transmission tunnel (3).
WARNING
When drilling, be sure to wear goggles for eye
protection or injury to personnel may occur.
Avoid skin contact with paint, primer, remover,
and thinner particularly if there are cuts
or open wounds on the hand.
Failure to do so
could result in serious injury.
8.
Using 2 5/8-inch hole saw, drill hole (1) in right side of transmission
tunnel (3).
9.
Install protector (2) in hole (1).
4-43