TM 9-2320-387-24-2
Change 1
25-113
25-35. A/C WIRING HARNESS AND CABLE MAINTENANCE (Contd)
FOLLOW-ON TASKS: Install A/C coolant line covers (para. 25-32).
Install air horn-to-air cleaner elbow (para. 3-15).
Install access hole cover plate (para. 25-36).
Install condenser fan access panel (para. 11-86).
Install heater/evaporator assembly cover (para. 25-21).
Install A/C front air distribution duct (para. 11-81).
11
2
12
6
13
14
10
1
15
2
9
4
2
5
6
7
8
~