TM 9-2320-387-24-2
I
12-45. HYDRO-BOOST VENT LINE REPLACEMENT
~~ 1
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Applicable hlodels
Ml113
Tools
General mechanics tool kit:
automotive
(Appendix B, Item 1)
hIaterials/Farts
Locknut (Appendix
G, Item 1541
Nut and lockwasher
assembly
(Appendix G, Item 244)
hlanual References
TM 9-2320-387-24P
Equipment Condition
Engine left splash shield removed (para. 10-231.
Maintenance Level
Unit
pI7ciGq
1.
Disconnect hydro-boost
vent line (21 from hydro-boost
(1).
2.
Remove nut and lockwasher
assembly (31, capscrew (101, clamp (41, harness clamp (91, and vent
line (21 from body (11). Discard nut and lockwasher
assembly (3).
3.
Remove locknut (61, washer (71, capscrew (81, washer (71, clamp (51, and vent line (2) from body (11).
Discard locknut (61.
4.
Remove two clamps (4) and (5) from vent line (2).
b. Installation
1.
Install two clamps (4) and (51 on vent line (2).
2.
Install vent line (2) and clamp (5) on body (11) with washer (71, capscrew (81, washer (71, and
locknut (6). Tighten capscrew (8) to 6 lb-ft (8 Nom).
3.
Install vent line (21, harness clamp (91, and clamp (4) on body (11) with capscrew (10) and nut and
lockwasher assembly (3).
4.
Connect vent line (2) to hydro-boost
(1).
FOLLOW-ON TASK: Install engine left splash shield (para. 10-23).
i 2-80