11-29. CARGO SHELL DOOR LEFT SIDE GAS SPRING MOUNTING BRACKET
MAINTENANCE
This task covers:
a. Removal
c.
Installation
b. Inspection
INITIAL SETUP:
Applicable Models
M1114
Tools
General mechanics tool kit:
automotive (Appendix B, Item 1)
Maintenance and repair shop equipment:
automotive (Appendix B, Item 2)
Personnel Required
One mechanic
One assistant
Materials/Parts
Sealing compound (Appendix C, Item 72.1)
Two locknuts (Appendix G, Item 169)
Manual References
TM 9-2320-387-10
TM 9-2320-387-24P
Equipment Condition
Tailgate lowered (TM 9-2320-387-10).
Cargo shell door gas spring removed
(para. 11-22).
Maintenance Level
Unit
1. Remove two locknuts (10), washers (9), and capscrews (7) from wheelhouse (8). Discard locknuts (10).
2. Remove capscrews (3) and (6), washer (5), strap (4), and bracket (2) from wheelhouse (8).
Refer to para. 10-56 for plusnut (1) inspection and installation.
1. Apply sealing compound to threads of capscrews (3) and (6), and install bracket (2) and strap (4) on
wheelhouse (8) with washer (5) and capscrews (3) and (6). Tighten capscrews (3) and (6) to
75 lb-in. (8 Nm).
2. Install bracket (2) on wheelhouse (8) with two capscrews (7), washers (9), and locknuts (10). Tighten
locknuts (10) to 10 lb-ft (14 Nm).
c. Installation
b. Inspection
a. Removal
TM 9-2320-387-24-2
11-52
Change 1