TM 9-2320-387-24-2
1 1 l-22.
CARGO SHELL DOOR GAS SPRING MAINTENANCE
(Contd)
I
2.
Remove four retaining rings (1) from rod sockets (2) on two gas spring assemblies (5).
3.
Remove left
bracket (6).
WARNING
Do not attempt to remove gas spring assemblies from ball studs
until cargo door is supported in full open position. Failure to do so
may result in injury to personnel or damage to equipment.
and right gas spring assemblies (5) from ball studs (3) on cargo door (4) and body
4.
Invert left gas spring assembly (5) 180 and position to right side of vehicle.
5.
Invert right gas spring assembly. (5) 180 and position to 1eR side of vehicle.
6.
Install left and right gas spring assemblies (5) over ball studs (3) on cargo door (4) and body
brackets (6).
7.
Install four retaining rings (1) in rod sockets (2) on two gas springs (5).
8.
Remove cargo door support.
11-42