T M 9 - 2 3 2 0 - 3 6 2 - 1 4 &P
4-10. POWER INTERFACE BOX TERMINAL REPLACEMENT (Contd)
c. Terminal 11E2 Removal
1.
Remove sixteen screws (8), cover (7) , and gasket (6) from power
interface box (1).
Discard gasket (6).
2.
Remove nut (2), lockwasher (3), and washer (4) that secure bus
bar (5) and bus bar (11) to terminal 11E2 (9).
3.
Remove nut (12) from inside terminal 11E2 (9) and remove terminal
11E2 (9).
d. Terminal 11E2 Installation
1.
Apply sealant to area of terminal that contacts power interface
box (1).
2.
Install terminal 11E2 (9) into power interface box (1) and secure
with nut (12).
3.
Secure bus bar (11) and bus bar (5) to terminal 11E2 (9) with
washer (4), lockwasher (3), and nut (2).
4.
Install gasket (6) and cover (7) on power interface box (1) and
secure with sixteen screws (8).
e. Terminal 11E3 Removal
1.
Remove sixteen screws (8), cover (7) , and gasket (6) from power
interface box (1).
Discard gasket (6).
2.
Remove nut (16), lockwasher (15), and washer (14) that secure bus
bar (17) and bus bar (11) to terminal 11E3 (10).
3.
Remove nut (13) from inside terminal 11E3 (10) and remove terminal
11E3 (10).
f. Terminal 11E3 Installation
1.
Apply sealant to area of terminal that contacts power interface
box (1).
2.
Install terminal 11E3 (10) into power interface box (1) and secure
with nut (13).
3.
Secure bus bar (11) and bus bar (17) to terminal 11E3 (10) with
washer (14), lockwasher (15), and nut (16).
4.
Install gasket (6) and cover (7) on power interface box (1) and
secure with sixteen screws (8).
4-14