TM 9-2320-280-20-3
10-108. 9,000 LB. WINCH REPLACEMENT (Contd)
I
b. Installation
I
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
position clamp (8) on power cables (15) at same distance from clamp (17) On winch (16) that was
recorded in removal.
Install clamp (8) on power cables (15) and bracket (6) with capscrew (9), lockwasher (3), and nut (4).
Install winch (16) on bumper (21) with two washers (27) and capscrews (26). Tighten capscrews (26)
to 35 lb-ft (47 Nom).
Install fairlead roller bracket (23) on bumper (21) and winch (16) with two washers (27) and
capscrews (26). Feed cable (28) through bumper (21) and bracket (23). Tighten capscrews (26) to
35 lb-ft (47 N~m).
Install two rollers (24) and shafts (22) on fairlead roller bracket (23) with four retaining rings (25).
Route power cables (15) in approximate mounting location in vehicle.
Install lead 7 (38) on starter terminal (35) with lockwasher (37) and nut (36). Tighten nut (36) to
15 lb-ft (20 N.m).
Install lead 6 (31) on starter terminal (32) with lockwasher (33) and nut (34). Tighten nut (34) to
25 lb-ft (34 N.m).
Install clamp (30) and power cables (15) on oil pan bracket screw (29) with nut and lockwasher
assembly (39).
Install clamp (10) on power cables (15) and airlift bracket (7) with capscrew (11).
Install bracket (6) on airlift bracket (7) with capscrew (5).
Install clamp (1) on power cables (15) and frame bracket (18) with capscrew (2), lockwasher (20), and nut (19).
Connect vent line (12) to fitting (13) on winch (16). Install vent line (12) on power cables (15) with four
tiedown straps (14).
10-186
