Section II. ILLUSTRATED MANUFACTURING INSTRUCTIONS (Cont'd)
Figure D-113. Test Module Assembly (Contd).
INSTRUCTIONS (CONTD):
31. Place electrical insulation sleeving (3) over wire (10) marked 1 on plug connector.
32. Place twenty-four sections of insulation sleeving (3) over connected wires (6) and (11) on LEDs (5) and
heat-shrink into position.
33. Install four screws (4) in mount holes (12) on mini-box top section (1) and position four spacers (2) and
punch board (7) on screws (4) and secure with four washers (8) and nuts (9).