TM 9-2320-280-20-2
4-85. WIRING HARNESS CONNECTOR REPAIR (Contd)
e. Receptacle Assembly Repair
NOTE
Refer to TB SIG-222 for soldering instructions.
1.
2.
3.
4.
5.
Strip cable insulation (1) to depth of solder wells (5) on inserts (6).
Slide cable ends (3) through grommet retaining nut (2) and grommet (4).
Place cable ends (3) into solder wells (5) and solder.
Slide grommet (4) over inserts (5) and press into receptacle (7) until seated.
Screw grommet retaining nut (2) into receptacle (7) until seated.
f. Protective Control Box Lower Cannon Plug Assembly Repair
1. Strip cable insulation (8) to depth of solder wells (16) on inserts (14).
2. Slide cable ends (10) through grommet retaining nut (9) and grommet
3. Slide insulation sleeving (17) over lead 67A (18).
4. Place cable ends (10) into solder wells (16) and solder.
NOTE
5.
6.
7.
(11).
Ensure insulation sleeving passes through grommet to provide a
water tight fit.
Slide insulation sleeving (17) up to solder well end (15), and heat shrink insulation sleeving (17).
Slide grommet (11) over inserts (14) and press into shell assembly (12) and coupling nut (13) until
seated.
Screw grommet retaining nut (9) into shell assembly (12) until seated.
FOLLOW-ON TASK: Connect battery ground cable (para. 4-73).
4-156