TM 9-2320-280-20-2
4-11. INSTRUMENT CLUSTER REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Tools
Manual References
General mechanics tool kit:
TM 9-2320-280-10
automotive (Appendix B, Item 1)
TM 9-2320-280-24P
Materials/Parts
Equipment Condition
Five lockwashers (Appendix G, Item 109)
Battery ground cable disconnected (para. 4-73).
Antiseize compound (Appendix C, Item 13)
NOTE
Prior to removal, tag leads for installation.
1. Remove four capscrews (6) from instrument cluster (7) and instrument panel (3). Pull instrument
cluster (7) away from instrument panel (3) to allow access to speedometer cable (4).
2. Loosen nut (5) and disconnect speedometer cable (4) from speedometer (1).
3. Disconnect harness lead 27J (8), 28A (9), 40B (13), 27H (14), 36A (15), 57L (19), 17B (20), 27G (21),
33A (22), 40C (17), and 567A (18), from instrument cluster (7).
4. Remove five nuts (12), lockwashers (11) and harness ground leads 58H (10), 58G (25), 58E (23), 58F (24),
and 57G (16) from instrument cluster (7) and remove instrument cluster (7). Discard lockwashers (11).
4-24