TM 9-2320-280-20-2
4-11. INSTRUMENT CLUSTER REPLACEMENT (Contd)
b. Installation
1. Apply antiseize compound to harness ground leads 58H (10), 58G (25), 58E (23), 58F (24), and
57G (16) and install on instrument cluster (7) with five lockwashers (11) and nuts (12).
2. Connect harness leads 27J (8), 28A (9), 40B (13), 27H (14), 36A (15) 57L (19), 17B (20), 27G (21),
33A (22), 40C (17), and 567A (18) to instrument cluster (7).
3. Connect speedometer cable (4) to speedometer (1) ensuring core (2) engages with square hole in
speedometer (1) and secure with nut (5).
4. Install instrument cluster (7) in panel (3) with four capscrews (6).
FOLLOW-ON TASKS: Connect battery ground cable (para. 4-73).
Check operation of instrument cluster components (TM 9-2320-280-10).
4-25