• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLY OF MAJOR COMPONENTS - Continued
ASSEMBLY OF MAJOR COMPONENTS - Continued

Maintenance Shop Mounted On HMMWV Heavy Model # M1097A2, P/N 50154-001
Page Navigation
  49    50    51    52    53  54  55    56    57    58    59  
img
.
TM 1-4940-355-12&P
0020 00
4
OUTSIDE OF
8
MAIN BOX
3
2
1
7
56
4
7
6
5
3
2
1
16
9
9
15
14
13
12 14
13
12
9
10
11
MS023091
Figure 7. Overhead Cargo/Maintenance Rack Assembly Installation
NOTE
Apply Loctite sealing compound to all bolts during installation and apply RTV
waterproofing compound around all bolt holes on Main Box Assembly.
11. Install two 3/8-inch bolts with lock washers and flat washers (5, 6, 7), in sequence, through Overhead Rack
Assembly and Angle Support into existing tapped holes in Main Box Assembly. Do not tighten. (Figure 7)
12. Install two 3/8-inch bolts with lock washers, flat washers and nuts (4, 3, 2, 1), in sequence, through Angle
Support and Overhead Rack Assembly. Do not tighten. (Figure 7)
0020 00-7
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.