• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Installation of Side Boxes
Figure 7. Overhead Cargo/Maintenance Rack Assembly Installation

Maintenance Shop Mounted On HMMWV Heavy Model # M1097A2, P/N 50154-001
Page Navigation
  48    49    50    51    52  53  54    55    56    57    58  
img
0020 00
TM 1-4940-355-12&P
8. Fold vehicle side mirrors in.
9. Remove all items from storage compartments of Overhead Cargo/Maintenance Rack Assembly. Position the
assembly in front of the vehicle.
WARNING
At least four people are required to lift and handle the Overhead Rack Assembly.
The assembly weighs approximately 218 pounds.
CAUTION
Overhead rack assembly should remain manually supported until all bolts have
been installed and tightened.
10. Protect HMMWV roof canvas, lift and position the Overhead Rack Assembly on top of HMMWV. Ensure rear
of Overhead Rack Assembly is positioned on the angle support (8) attached to the Main Box Assembly and
the front of Overhead Rack Assembly is positioned on all three front supports (10, 11, 15). (Figure 7)
Change 1
0020 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.