TM 9-2330-392-14&P
Change 2
4-109
Section XI. BODY MAINTENANCE
4-38
CARGO BODY REPAIR.
This task covers:
a. Tailgate Removal
j. Cargo Tiedown Installation
b. Tailgate Installation
k. Shackle Removal
c. Tailgate Lanyard and Mount Removal
l. Shackle Installation
d. Tailgate Lanyard and Mount Installation
m.Tailgate Hinge Removal
e. Tailgate Latch Assembly Removal
n. Tailgate Hinge Installation
f.
Tailgate Latch Assembly Installation
o. Tailgate Latching Pin Lanyard
g. Tailgate Latch Assembly Pin Removal
Removal
h. Tailgate Latch Assembly Pin Installation
p. Tailgate Latching Pin Lanyard
i.
Cargo Tiedown Removal
Installation
Initial Setup:
Equipment Conditions:
Parked on a level surface
Wheels chocked (para 2-8.1).
Handbrakes applied.
Materials/Parts
Rivet
Locknut
Cotter Pin
Tools/Test Equipment:
General mechanics tool kit
Common No. 1 shop set