TM 9-2320-387-24-2
Change 1
25-37
Section II. AIR CONDITIONING MAINTENANCE
25-14. AIR CONDITIONING MAINTENANCE TASK SUMMARY
TASK
PAGE
PARA.
PROCEDURES
NO.
25-15.
A/C System Servicing
25-38
25-16.
A/C Receiver/Dryer (Front) Maintenance
25-48
25-17.
A/C Receiver/Dryer (Rear) Replacement
25-50
25-17.1.
A/C Receiver/Dryer (Rear) Lines Replacement
25-50.2
25-18.
A/C Condenser Maintenance
25-52
25-19.
A/C Condenser Fan and Shroud Replacement
25-54
25-20.
A/C Compressor Replacement
25-56
25-20.1.
A/C Compressor Manifold Replacement
25-56.2
25-21.
A/C Heater/Evaporator Assembly (Front) Replacement
25-58
25-22.
A/C Evaporator Assembly (Rear) Maintenance
25-62
25-23.
A/C Trinary Switch Replacement
25-64
25-24.
A/C Thermostat Replacement
25-66
25-25.
A/C Blower Motor Replacement
25-67
25-26.
A/C Heater/Evaporator Assembly (Front) Maintenance
25-68
25-27.
A/C Evaporator Assembly (Rear) Maintenance
25-72
25-28.
A/C Condenser Assembly Maintenance
25-74
25-29.
A/C Evaporator (Rear) Supply and Return Line Replacement
25-76
25-30.
A/C Compressor Hose Assembly Maintenance
25-78
25-31.
A/C Pressure Hoses Maintenance
25-80
25-32.
A/C Coolant Line Covers Maintenance
25-84
25-33.
A/C Condenser Hose Assemblies Replacement
25-88
25-34.
A/C and De-Ice Relays Replacement
25-90
25-35.
A/C Wiring Harness and Cable Maintenance
25-94
25-36.
Access Hole Cover Plate Maintenance
25-114
25-37.
Left Side Tunnel Insulation Replacement
25-116
