TM 9-2320-387-24-2
25-26
Change 1
25-9. C-PILLAR PARTITION MAINTENANCE (Contd)
2.
Remove two locknuts (5), capscrews (1), four washers (2), and isolator mount bushings (3) from two
C-pillar partition isolator brackets (4). Discard locknuts (5).
3.
Remove two locknuts (7), D-ring washers (6), D-rings (8), capscrews (12), washers (10), isolator
bushings (11), C-pillar partition isolator brackets (4), isolator bushings (11), and washers (10) from
C-pillar partition (9). Discard locknuts (7).
4.
Remove locknut (16), D-ring washer (15), D-ring (14), capscrew (13), and washer (17) from C-pillar
partition (9). Discard locknut (16).
5.
Remove three locknuts (21), capscrews (18), washers (19), and cable access cover (20) from C-pillar
partition (9). Discard locknuts (21).
Refer to para. 10-56 for plusnut inspection and replacement.
1.
Install cable access cover (20) on C-pillar partition (9) with three washers (19), capscrews (18), and
locknuts (21). Tighten locknuts (21) to 10 lb-ft (14 Nm).
2.
Install D-ring (14) on C-pillar partition (9) with washer (17), capscrew (13), D-ring washer (15), and
locknut (16). Tighten locknut (16) to 35 lb-ft (47 Nm).
3.
Install two washers (10) and (2), isolator bushings (11) and (3), and C-pillar partition isolator
brackets (4) on C-pillar partition (9) with two isolator bushings (11) and (3), washers (10) and (2),
capscrews (12) and (1), D-rings (8), D-ring washers (6), and locknuts (7) and (5). Tighten locknuts (7)
and (5) to 35 lb-ft (47 Nm).
4.
Install stop bracket (25) on C-pillar partition (9) with washer (30), capscrew (29), and locknut (24).
Tighten locknut (24) to 10 lb-ft (14 Nm).
1.
Position C-pillar partition (9) and two shims (22) on floor (26) between wheelwells (31).
2.
Apply sealing compound to threads of eight capscrews (23), and install two C-pillar partition
isolator brackets (4) on wheelwells (31) with eight capscrews (23). Tighten capscrews (23) 10 lb-ft
(14 Nm).
3.
Apply sealing compound to threads of two capscrews (28), and install C-pillar partition stop bracket (25)
on floor (26) with two washers (27) and capscrews (28). Tighten capscrews (28) to 75 lb-in. (8 Nm).
4.
Install C-pillar gap bracket (33) on wheelwell (31) with four capscrews (32).
d. Installation
c. Assembly
b.1. Inspection
1
2
4
3
5
6
7
8
9
10
11
10
12
2
3
13
14
9
17
15
16