TM 9-2320-387-24-2
25-2
Change 1
25-3. ROOF PANEL AND RESILIENT MOUNT MAINTENANCE
This task covers:
a.
Removal
c.
Installation
b.
Cleaning and Inspection
INITIAL SETUP:
Applicable Models
M1114
Tools
General mechanics tool kit:
automotive (Appendix B, Item 1)
Automotive maintenance and repair: field
maintenance, basic (Appendix B, Item 6)
Materials/Parts
Twenty-nine locknuts (Appendix G, Item 156)
Tape (Appendix C, Item 80)
Sealant (Appendix C, Item 74)
Personnel Required
One mechanic
One assistant
Manual References
TM 9-2320-387-24P
Equipment Condition
Turret bearing and stop ring removed (para. 11-57).
General Safety Instructions
Direct all personnel to stand clear during hoisting
operations.
Maintenance Level
Direct support
1.
Remove three nuts (19), capscrews (22), and spacer(s) (20) from left and right side roof panel (2).
2.
Remove twenty-two locknuts (4) and capscrews (1) from roof panel (2) and turret frame (3). Discard
locknuts (4).
3.
Remove seven locknuts (12), washers (13), plates (14), resilient mounts (15), and spacers (10) from
three C-pillar mounts (17), center roof mounts (9), and right and left side windshield mounts (18).
Discard locknuts (12).
.WARNING.
Direct all personnel to stand clear during hoisting operations. A
heavy or swinging load can be dangerous. Failure to do so may
cause injury to personnel or damage to equipment.
4.
Using a lifting device, lift roof panel (2) until it is clear of resilient mounts (8).
5.
Remove seven resilient mounts (8) and plates (7) from roof mounts (5).
6.
Remove seven studs (11) and brackets (6) from roof mounts (5).
7.
Lift roof panel (2) clear of C-pillar mounts (17), center roof mounts (9), and right and left side
windshield mounts (18).
1.
Remove tape and foam rubber from mating surfaces of roof panel (2) and windshield assembly (16).
2.
Clean and inspect mating surfaces of roof panel (2) and windshield assembly (16). Ensure mating
surfaces are clean and smooth.
3.
Ensure seals on header are in place and serviceable.
.WARNING.
Direct all personnel to stand clear during hoisting operations. A
heavy or swinging load can be dangerous. Failure to do so may
cause injury to personnel or damage to equipment.
1.
Using a lifting device, lift roof panel (2) over mounting surfaces.
c. Installation
b. Cleaning and Inspection
a. Removal