TM 9-2320-387-24-2
1 1 l-1 5. CARGO SHELL DOOR WIRE HANDLE LOCK REPLACEMENT
I
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Applicable Models
&I1114
Manual References
TM 9-2320-387-10
TM 9-2320-387-24P
Tools
General mechanics tool kit:
Equipment Condition
automotive (Appendix B, Item 1)
Tailgate lowered (TM 9-2320-387-10X
Materials/Parts
TNO pushnuts (Appendix G, Item 312)
Sealing compound (Appendix C, Item 70)
Maintenance Level
unit
p7izz-l
1.
Remove two pushnuts (11, rod end clips (2), and latch rods (3) from wire handle lock pivot
arms (4). Discard pushnuts (1).
2.
&move four nuts (g), washers (61, capscrews (81, washers (61, and wire handle lock (9) from cargo
door (7).
1 b. Installation 1
1.
Apply sealing compound to threads of four capscrews (8).
2.
Install wire handle lock (9) on cargo door (7) with four washers (61, capscrews (81, washers (6), and
nuts (5).
3.
Install two latch rods (3) on wire handle lock pivot arms (4) with rod end clips (21 and pushnuts (1).
FOLLOW-ON TASKS: l Raise and secure tailgate (TM 9-2320-387-10).
l Check cargo shell door for proper operation (TM 9-2320-387-101.
11-32
