5-8
Change 1
5-3. TRANSMISSION OIL COOLER LINES REPLACEMENT (Contd)
1.
Install clamps (22), (24), (25), and (27) on hoses (21) and (29). Install hoses (21) and (29) on
tees (10) and (13).
2.
Install clamps (14), (16), (19), and (26) on hoses (15) and (20). Install hoses (15) and (20) on
tees (10) and (13).
3.
Install two clamps (12) on hose (11). Install hose (11) on line (8) and tee (13).
4.
Install two clamps (28) on hose (9). Install hose (9) on line (31) and tee (10).
5.
Install two clamps (1) and (3) on two hoses (2). Install hoses (2) on lines (7) and (31).
6.
Install lines and hoses as an assembly on vehicle and connect lines (7) and (8) to transmission (30).
7.
Connect hoses (2) to transfer case (34).
8.
Connect hoses (21) and (29) to bypass valve (23).
9.
Connect hoses (15) and (20) to lines (17) and (18).
10.
Install two washers (5), capscrews (4), washers (33), and locknuts (32) on four retaining clamps (6)
and cooler lines (7) and (31).
b. Rear Lines Installation
TM 9-2320-387-24-1