TM 9-2320-362-14&P
4-18. EES KIT INSTALLATION (Contd)
b. Tunnel Interior Side Insulation Blanket and Retainer Installation
1.
Using new insulation retainer (5) as template, determine location of
hole (17) to be drilled near 2 5/8-inch hole (18) in transmission
tunnel (16).
2.
3.
4.
5.
6.
7.
8.
9.
Using # 21
WARNING
When drilling, be sure to wear goggles for eye
protection or injury to personnel may occur.
Avoid skin contact with paint, primer, remover,
and thinner particularly if there are cuts
or open wounds on the hand.
Failure to do so
could result in serious injury.
drill bit, drill hole (17) in transmission tunnel (16).
Position new insulation blanket (10) in place against cargo floor (4),
transmission tunnel (16), and floor (8).
Lift up right front cowl insulation (15) and secure new insulation
blanket (10) to floor (8) with two screws (14) and one retainer (13).
Secure new insulation blanket (10) to floor (8) with two screws (7), and
one retainer (6).
Install new insulation retainer (5) to transmission tunnel (16) and
secure with one screw (1) and and one bolt (9).
Secure one retaining clip (11) and one screw (12) to transmission
tunnel (16) to hold new insulation retainer (5). against insulation
blanket (10).
Position retaining rod (2) into sleeve of insulation blanket (10).
Secure retaining rod (2) to cargo floor (4) with two screws (3).
4-52
