TM 9-2320-280-20-3
11-212. BLOWER ASSEMBLY REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Applicable Models
Manual References
M996, M996A1
TM 9-2320-280-10
TM 9-2320-280-24P
Tools
General mechanics tool kit
Equipment Condition
automotive (Appendix B, Item 1)
l Battery ground cable disconnected (para. 4-73).
s Heater compartment panel removed
Materials/Parts
(para. 11-204).
Four nut and lockwasher assemblies
(Appendix G, Item 149)
Pushnut (Appendix G, Item 170)
Four rivets (Appendix G, Item 189)
NOTE
For instructions on replacement of rivets, refer to para. 10-66.
1.
2.
3.
4.
Loosen two clamps (5) and disconnect hose ducts (2) from diverter box (8).
Remove pushnut (3) and disconnect control linkage (4) from diverter box arm (17). Discard
pushnut (3).
NOTE
Prior to removal tag leads for installation,
Disconnect harness leads 770 (12), 771 (13), and 772 (14) from blower motor leads (11).
Remove four nut and lockwasher assemblies (10), capscrews (6), washers (7), harness clamp (9), two
ground terminals (15), and blower assembly (1) from bracket (16). Discard nut and lockwasher
assemblies (10).
11-321
