TM 9-2320-280-20-2
4-77. STARTER POWER CABLES REPLACEMENT (Contd)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Install coil (16) on positive cable (11) and grommet cable (20). Route STE/ICE-R harness (14) and compressor
harness (1) (M997 and M997A1 vehicles only) through coil (16), and place cables (11) and (20), STE/ICE-R
harness (14), and compressor harness (1) (M997 and M997A1 vehicles only) in approximate mounting locations.
Install positive cable (11) and lead 6B/6C (37) on power stud (30) with washer (36), lockwasher (35), and
nut (34). Tighten nut (34) to 26 lb-ft (35 Nm). Slide rubber boot (29) over power stud (30).
Install ground cable (20) on ground stud (31) with lockwasher (32) and nut (33). Tighten nut (33) to
75 lb-ft (102 Nm).
NOTE
Perform step 4 for all vehicles except A2 series vehicles. Perform
steps 5 and 6 for M997A2, M1025A2, M1035A2, M1043A2, M1045A2,
and M1097A2 vehicles only.
Install STE/ICE-R leads 81B (8) and 81A (9), positive accessory cable (10), and positive cable (11),
(vehicles with winch or 200 amp alternator only) on positive post (7) with lockwasher (12) and nut (13).
Tighten nut (13) in 25-30 lb-ft (34-41 Nm).
Install lead 81B (8) on positive post (7) with lockwasher (12) and nut (13). Tighten nut (13) to
25-30 lb-ft (34-41 Nm).
Install positive accessory cable (49) and positive cable (48) (vehicles with winch or 200 amp alternator only)
on buss bar (44) with two washers (47), lockwashers (46), and nuts (45). Tighten nuts (45) to 25-30 lb-ft
(3441 Nm).
Apply sealant to positive post (7) and cable terminals so that all exposed metallic surfaces are coated. The
sealant should be evenly applied with a minimum thickness of .12 in. (3 mm).
Install lead 7C (22) (winch vehicles only), STE/ICE-R 3C lead (21), and ground cable (20) on negative post (23)
with lockwasher (19) and nut (18). Tighten nut (18) to 15-20 lb-ft (20-27 Nm).
Install leads 74A (27) and 74B (26) on solenoid (28) with clip (25) and screw (24).
Install two clamps (17) on positive cable (11) and ground cable (20) and secure to starter (6) with screws (15).
NOTE
Perform steps 11 through 14 for M997, M997A1, and M997A2
vehicles only.
Connect compressor harness leads (39) to compressor leads (38).
Install clamp (41) on compressor harness (1) and capscrew (40) with lockwasher (42) and nut (43).
Install clamp (2) on compressor harness (1) and cable bracket screw (4) with nut and lockwasher
assembly (3).
Install compressor harness (1) on alternator cable (10) and lead 81A (9) with tiedown strap (5).
4-130
