TM 9-2320-280-20-2
3-45. HAND THROTTLE CONTROL CABLE AND BRACKET REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Tools
Personnel Required
General mechanics tool kit:
One mechanic
automotive (Appendix B, Item 1)
One assistant
Materials/Parts
Manual References
Four locknuts (Appendix G, Item 58)
TM 9-2320-280-24P
O-ring seal (Appendix G, Item 156)
Lockwasher (Appendix G, Item 120)
a. Removal
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Remove four screws (6) and instrument cluster (7) from instrument panel (3) and pull instrument
cluster (7) away to allow access to speedometer cable (4).
Loosen nut (5) and disconnect speedometer cable (4) from speedometer (1).
Remove hitch pin (19) and washer (18) and disconnect hand throttle clevis (16) from accelerator
rod (17)
Remove locknut (8), washer (9), screw (10), washer (9), and hand throttle cable (11) from bracket (12).
Discard locknut (8).
Remove two locknuts (13), washers (14), capscrews (20), washers (14), and bracket (12) from
cowl (15) Discard locknuts (13).
Loosen nut (25) and hand throttle cable (11) from bracket (23).
Remove locknut (21), washer (28), capscrew (27), and washer (28) from bracket (23) and instrument
panel (3). Discard locknut (21).
Remove nut (22), screw (24), and bracket (23) from instrument panel (3).
Remove setscrew (30) and handle (31) from hand throttle cable (11).
Remove nut (25), lockwasher (32), O-ring (33), and nut (26) from hand throttle cable (11). Discard
O-ring (33) and lockwasher (32).
3-84
