TM 9-2320-280-20-1
STARTER SOLENOID VOLTS TEST #70
Description:
This procedure measures the voltage present
at the starter solenoids positive terminal. Test
requires DCA hookup only.
Typical Applications:
Check Starter Solenoid Volts.
Test Procedure:
1. Discoonned Fuel Solenoid wire 54A toprevent
starting.
2. Set TEST SELECT switch to 70.
3. Press and release TEST button.
4. Crank the engine and observe the displayed
voltage.
Pre-Test Procedures:
Run Confidence Test.
Control Functions:
01,02,03,04,08
Possible Error Messages:
None
2-743