NOTE
Prior to removal, tag leads for installation.
Steps 51 through 58 are for the 200-ampere dual voltage
alternator. The 400-ampere dual voltage alternator
procedures are similar.
51.
Slide back rubber boot (1) and remove nut (16), lead 568 (15), and washer (14) from
IGN terminal (13).
52.
Slide back rubber boot (2) and remove nut (3), lead 2A (4), and washer (5) from AC terminal (6).
53.
Slide back rubber boot (10) and remove nut (11), washer (9), and lead (12) from terminal (8).
54.
Remove nut (31), lockwasher (30), washer (29), and ground strap (28) from negative stud (27).
Discard lockwasher (30).
55.
Slide back rubber boot (17) and remove nut (18), lockwasher (19), washer (20), and alternator
positive cable (21) from positive stud (24). Discard lockwasher (19).
56.
Position 3/8-in. breaker bar or, as appropriate, a 1/2-in. ratchet wrench on belt tensioner (32), move
tensioner (32) clockwise, and remove drivebelt (25) from alternator pulley (26).
WARNING
Alternator must be supported during removal. Failure to support
alternator may cause injury to personnel or damage to equipment.
57.
Remove nut (38), lockwasher (37), washer (33), capscrew (34), and washer (33) from alternator (7)
and support bracket (36). Discard lockwasher (37).
58.
Remove alternator (7).