Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
15-l 3. FRONT COVER OIL SEAL REPLACEMENT
15-l 5. OIL PUMP MAINTENANCE
TM-9-2320-387-24-2 Truck Utility: Shelter Carrier 4 x 4 M113 Truck Utility: UP-Armored Carrier 4 x 4 M114 Manual
Page Navigation
540
541
542
543
544
545
546
547
548
549
550
TM
9-2320-387-24-2
15 14. OIL PUMP DRIVE REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Tools
General mechanic’s tool kit:
automotive (Appendix
B, Item 1)
Materials/Parts
Gasket (Appendix
G,
Item 80)
Manual References
TM 9-2320-387-24P
Equipment Condition
l
Battery ground cables disconnected (para. 4-68).
l
Turbocharger removed (para. 15-21).
Maintenance Level
Direct support
NOTE
Prying may be performed around head of oil pump drive to assist
in loosening oil pump drive for removal.
1.
Remove capscrew’(2) and clamp (3) from engine cylinder block (4).
2.
Remove
oil pump
drive (1) and gasket (5) from engine cylinder block (4). Discard gasket (5).
Install gasket (5) and oil pump drive (1) in engine cylinder block (4).
Secure
oil pump
drive (1) to engine cylinder block (4) with clamp (3) and capscrew
capscrew (2) to 25-37 lb-ft (34-50 N-m).
(2).
Tighten
FOLLOW-ON TASKS:
l
Install turbocharger (para. 15-21).
l
Connect battery ground cables (para. 4-68).
15-29
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business