TM 9-2320-387-24-2
1 32-4. FRAME INSPECTION AND REPAIR (Contd)
I
b. Powertrain Lift Sling Installation
WARNING
. To avoid possible injury to personnel and damage to equipment,
ensure shoulder bolts have a raised metal 10.9 material
strength
indicator on the head of the bolts.
l Rope lift slings are awkward and potentially
hazardous
to
personnel
and can cause damage to equipment.
Replace rope lift
sling with powertrain
IiR sling.
1.
Install power-train lift sling (5) on cylinder heads (1) with four shoulder bolts (P/N 11502788) (6).
2.
Install shackle (P/N NAS1042-14) (3) on powertrain
lift sling (5) with pin (4) and cotter pin (2).
32-3