4-7. 200-AMPERE DUAL VOLTAGE UMBILICAL POWER CABLE REPLACEMENT
This task covers:
a. Removal
b. Installation
a. Removal
1.
Remove nut (5), lockwasher (4), washer (3), and positive power cable (2) from buss bar (1).
Discard lockwasher (4).
2.
Remove capscrew (6), lockwasher (7), negative power cable (8), and two cables (9) from shunt (10).
Discard lockwasher (7).
3.
Remove five capscrews (20), two lockwashers (19), washers (18), and coverplate (17) from B-beam (12).
Discard lockwashers (19).
4.
Remove two nuts (15), washers (14), capscrews (25), washers (26), and mounting bracket (27) from
coverplate (17).
5.
Remove nut (28), screw (23), and cover (22) with cover chain (21) from mounting bracket (27).
6.
Remove cover (22) with cover chain (21) from umbilical power cable assembly (29).
7.
Remove four nuts (30), screws (24), and mounting bracket (27) from umbilical power cable assembly (29).
8.
Pull umbilical power cable assembly (29) through grommet (11) and coverplate (17), and remove
from vehicle (16).
9.
Remove grommet (11) from battery box (13).
INITIAL SETUP:
Applicable Models
M1113
Tools
General mechanics tool kit:
automotive (Appendix B, Item 1)
Materials/Parts
Four lockwashers (Appendix G, Item 215)
Sealing compound (Appendix C, Item 64)
Personnel Required
One mechanic
One assistant
Manual References
TM 9-2320-387-24P
Equipment Condition
Batteries removed (para. 4-74).
Fixed rear door removed (para. 10-20).
Maintenance Level
Unit
TM 9-2320-387-24-1
4-14
Change 1
NOTE
Prior to removal, tag leads for installation.