TM 9-2320-280-20-3
Change 1
12-35
18.
Remove nut (15) from IGN terminal (14) on regulator (13).
19.
Install boot (17) on lead 5A (16).
20.
Install lead 5A (16) to IGN terminal (14) on regulator (13) with nut (15). Tighten nut (15) to
23-27 lb-in. (2-3 Nm).
21.
Apply grease to IGN terminal (14), lead 5A (16), and inside of boot (17), and slide boot (17) over IGN
terminal (2).
22.
Remove nut (18) from AC terminal (21) on regulator (13).
23.
Install boot (20) on lead 2A (19).
24.
Install lead 2A (19) to AC terminal (21) on regulator (13) with nut (18). Tighten nut (18) to
18-22 lb-in. (2-3 Nm).
25.
Apply grease to AC terminal (21), lead 2A (19), and inside of boot (20), and slide boot (20) over AC
terminal (21).
12-24.1. 100/200 AMPERE DUAL VOLTAGE ALTERNATOR AND REGULATOR
CONVERSION (Contd)
FOLLOW-ON TASKS: Connect battery ground cable (para. 4-73).
Lower and secure hood (TM 9-2320-280-10).