TM 9-2320-280-20-3
Change 1
12-34.7
NOTE
Do not connect electrical connections when performing step 4.
4.
Install alternator assembly (para. 12-23).
5.
Remove screw (13), lockwasher (14), and washer (15) from regulator (19). Discard lockwasher (14).
6.
Install ground wire (16), washer (15), lockwasher (14), and screw (13) on regulator (19). Tighten
screw (13) to 88-94 lb-in. (10-11 Nm).
7.
Route ground wire (16) around regulator (19) to 14-volt stud (18), remove nut (17) from stud (18),
and install ground wire (16) on stud (18) with nut (17). Tighten nut (17) to 45-55 lb-in. (5-6 Nm).
8.
Apply sealant to nut (17) and stud (18).
9.
Assemble dummy plug (7) by installing plug (8) in shell (9).
10.
Remove lead 568 (20) from lead 568A (11). Discard lead 568 (20).
11.
Install dummy plug assembly (7) in lead 568A (11).
12.
Secure lead 568A (11) to electrical harness (12) with tiedown strap (10).
12-24.1. 100/200 AMPERE DUAL VOLTAGE ALTERNATOR AND REGULATOR
CONVERSION (Contd)