FOLLOW-ON TASKS: Lower and secure hood (TM 9-2320-280-10).
Connect battery ground cables (para. 4-73).
TM 9-2320-280-20-3
Change 1
12-28.1
7.
Install washer (15), lead 2A (16), and nut (17) on yellow (AC) terminal (14). Tighten nut (17) to
18-22 lb-in. (2.0-2.5 Nm). Slide rubber boot (18) over terminal (14).
8.
Connect regulator plug (1) to voltage regulator (4).
12-22. 100 AMPERE REGULATOR (12342944, N3106) REPLACEMENT (Cont'd)