NOTE
Perform steps 1 through 5 for old configuration.
Perform steps 6 through 20 for new configuration.
1.
Disconnect vent line (2) from elbow (1).
2.
Remove elbow (1) from transfer case (3).
3.
Remove two capscrews (5), clamps (4), and vent line (2) from bracket (8) and transmission governor
cover (6).
4.
Disconnect three vent lines (2) from tee (7).
5.
Remove clamps (4) from vent line (2).
6.
Disconnect vent line (11) from elbow (10).
7.
Remove elbow (10) and pipe nipple (9) from transfer case (3).
8.
Remove two capscrews (5), clamps (4), and vent line (11) from bracket (8) and transmission governor
cover (6).
9.
Remove two tiedown straps (12) from vent lines (13) and (15). Discard tiedown straps (12).
10.
Disconnect vent lines (11) and (13) from elbow (16).
11.
Remove clamps (4) from vent line (11).
12.
Disconnect vent line (13) from elbow (14).
a. Removal
INITIAL SETUP:
TM 9-2320-280-20-2
5-52
Change 2
5-25. TRANSFER CASE VENT LINE REPLACEMENT
This task covers:
a.
Removal
b.
Installation
Tools
General mechanics tool kit:
automotive (Appendix B, Item 1)
Materials/Parts
Four tiedown straps (Appendix G, Item 242.2)
Manual References
TM 9-230-280-24P
