TM 9-2330-392-14&P
Change 2
B-5
Section II. MAINTENANCE ALLOCATION CHART - Continued
(1)
Group
Number
(2)
Component/
Assembly
(3)
Maintenance
Function
(4)
Maintenance Level
(5)
Tools and
Equipment
(6)
Remarks
Unit
DS
GS
Depot
C
O
F
H
D
13
WHEELS AND TIRES
1311
Wheel Assembly
Drum, Brake
Inspect
Replace
Repair
0.5
1.0
2.0
1,2
1,2
5
(E)
Hub Bearings, Wheel
Service
Adjust
Replace
Repair
1.0
0.2
1.0
1.0
1,2
1,2
1,2
1,2
(G)
Wheel
Inspect
Replace
Repair
0.1
1.0
1.0
1,2
1,2
1,2
(H)
Wheel and Tire Assem-
bly
Inspect
Replace
0.1
0.5
1,2
1313
Tires, Tubes, Tire
Chains
Tire
Inspect
Replace
Repair
0.1
1.0
1.0
1.0
1,5
1,2
(N)
15
FRAME, TOWING
ATTACHMENTS,
DRAWBARS, AND
ARTICULATION
SYSTEMS
1501
Frame Assembly (Chas-
sis)
Inspect
Repair
0.1
2.0
1,2
(I)
1503
Pintles and Towing
Attachments
Chains, Safety
Inspect
Replace
0.1
0.5
1,2
Lunette
Inspect
Replace
0.1
0.1
0.5
1,2
1507
Landing Gear,
Leveling Jacks
Leg, Support, Front
(Adjustable)
Inspect
Replace
Repair
0.1
1.0
1.0
1,2
1,2
(J)