TM 9-2320-387-24-2
FOLLOW-ON TASKS: Fill cooling system (para. 3-61).
Charge A/C system (para. 25-15).
Install air distribution duct (para. 11-81).
Install air cleaner (para. 3-12).
25-21. A/C HEATER/EVAPORATOR ASSEMBLY (FRONT) REPLACEMENT (Cont'd)
Change 1
25-61
20
21
22
23
24
25
26
27
28
29
25
14
30
31
32
33
34
35
36
37
38