TM 9-2320-387-24-1
5-24
Change 1
5-10. TRANSMISSION VENT LINE REPLACEMENT
This task covers:
a. Removal
b. Installation
a. Removal
b. Installation
1.
Remove vent line (2) from transmission (3) and tee fitting (1).
2.
Remove vent line (12) from tee fittings (1) and (11).
3.
Remove capscrew (5), clamp (7), and vent line (10) from engine mount bracket (6).
4.
Remove capscrew (4), clamp (8), and vent line (10) from bracket (9).
5.
Remove vent line (10) from tee fittings (11) and (13).
6.
Remove clamps (7) and (8) from vent line (10).
1.
Install clamps (7) and (8) on vent line (10).
2.
Install vent line (10) on tee fittings (11) and (13).
3.
Install vent line (10) and clamp (7) on engine mount bracket (6) with capscrew (5).
4.
Install vent line (10) and clamp (8) on bracket (9) with capscrew (4).
5.
Install vent line (12) on tee fittings (11) and (1).
6.
Install vent line (2) on tee fitting (1) and transmission (3).
7.
Install insulation if removed.
INITIAL SETUP:
Tools
General mechanics tool kit:
automotive (Appendix B, Item 1)
Manual References
TM 9-2320-387-24P
Maintenance Level
Unit
NOTE
Insulation may need to be removed to access vent lines.