6 lb-ft (8 N m).
c. Assembly
TM 9-2320-280-20-3
12-149. MORTAR AMMO CONTAINER MAINTENANCE (Contd)
1.
2.
3.
4.
5.
6.
7.
Install ammo container (29) and ammo container floor (6) on ammo container base (16) with sixteen
washers (5), capscrews (4), washers (5), and locknuts (17). Tighten locknuts (17) to 15 lb-ft (20 Nm).
Install two ammo container reinforcements (1) on ammo container (29) with twenty capscrews (7),
washers (3), and locknuts (2). Tighten locknuts (2) to 6 lb-ft (8 Nm).
Install four tiedown brackets (19) on ammo container base (16) with four washers (20),
capscrews (18), and locknuts (21).
Install two base plate brackets (24) on ammo container (29) with two capscrews (25), washers (23),
and locknuts (22). Tighten locknuts (22) to 6 lb-ft (8 Nm).
Install strap bracket (27) on ammo container (29) with two capscrews (26), washers (30), and
locknuts (31). Tighten locknuts (31) to 6 lb-ft (8 Nm).
Install three straps (14) and ammo container supports (8) on ammo container (29) with twelve
washers (9), capscrews (10), washers (9), and locknuts (28). Tighten locknuts (28) to 6 lb-ft (8 Nm).
Install six footman loops (13) and three straps (14) on ammo container supports (8) with twelve
washers (12), capscrews (11), washers (12), and locknuts (15). Tighten locknuts (15) tO
12-238