TM 9-2320-280-20-2
4-127. HEAT/AIR-CONDITIONING CONTROL PANEL RELAY AND SWITCH
MAINTENANCE (M997, M997A1, M997A2) (Contd)
NOTE
Prior to removal, tag leads for installation.
m. Rollover Switch Removal
Disconnect two rollover switch leads (4) from harness leads (3) and pull rollover switch (2) out of
switch bracket (1).
n. Rollover Switch Installation
Connect two harness leads (3) to rollover switch leads (4) and snap in rollover switch (2) into
switch bracket (1).
FOLLOW-ON TASK: Connect battery ground cable (para. 4-73).
4-325/(4-326 blank)