TM 9-2320-280-20-1
REFERENCE INFORMATION
PROTECTIVE CONTROL BOX/DISTRIBUTION BOX
Change 1 2-229
1. Remove instrument panel, refer to (para. 4-12).
2. Remove nut and lockwasher assembly and
engine harness ground lead 3C from body.
Remove nut and lockwasher assembly ,
capscrew, and harness ground leads 57A
and 79A from body. Discard nut and
lockwasher assemblies.
3. Inspect and clean wires and connection points.
4. Apply antiseize compound to harness ground
leads 57A and 79A and install on body with
capscrew and nut and lockwasher assembly.
Apply antiseize compound to engine harness
ground lead 3C and install on body with nut
and lockwasher assembly.
5. Cover leads 3C, 57A, and 79A with RTV.
6. Install instrument panel, refer to (para. 4-12).